The facilities built as part of the project:
• 220 kV Chara — Udokan MMP HV line No. 1, 2
• 220 kV Chara — Bluzhdayuschy HV line No. 1, 2
• 35/6 kV substation, 35 kV HV line, and 10 kV cable line

The overhead power lines have ensured the supply of electricity to the Udokan MMP facilities, rotation camps, and equipment yards. The foundations of all transmission towers were designed given the challenging climatic and seismic conditions in the north of the Trans-Baikal Territory.
Construction of power supply facilities for the Udokan mining and metallurgical plant
Customer: Udokanskaya Med LLC
Object type: electric grid construction
Location: Trans-Baikal Territory
Completion period: December 2018 - September 2023