Integrated gas treatment unit of the Srednebotuobinskoye oil and gas condensate field near the Tas-Yuryakh village. EPC Turnkey Contract. Design, supply of materials, construction, installation and commissioning works
Customer: ALROSA-Gas JSC
Object type: Oil and gas construction
District: Far eastern federal district
Year: 2023-2026
Design, supply of material and technical resources and equipment, construction, installation and commissioning works on a turnkey basis. The facility being designed (integrated gas treatment unit and shift residential complex) is located in the southern part of Mirny District of the Republic of Sakha (Yakutia), 150 km southwest of Mirny, 151 km northwest of Lensk and 5.5 km east of Tas-Yuryakh village. The territory has sharply continental climate, characterized by long snowy winter with frosts up to -60 °C and hot summer with temperatures up to +36 °C. Despite unfavorable weather and climatic conditions and permafrost soils, all works are planned to be carried out in accordance with the approved schedule, risk mitigation will be facilitated by the development of detailed design documentation in parallel with the draft documentation, early delivery of material and technical resources and the commencement of engineering preparations in the 2023−2024 season. Commercial operation of Srednebotuobinskoye oil and gas condensate field was commenced in October 2013, and this is one of the largest fields in Eastern Siberia and belongs to the subsoil areas of federal significance in terms of estimated reserves (134 million tons of oil and 155 billion cubic meters of natural gas).

The new integrated gas treatment unit with a capacity of 4 million cubic meters per day will make it possible to organize gas supply to the 550 MW Novolenskaya TPP under construction, which will be commissioned in 2028. The Novolenskaya TPP will enhance the reliability of power supply in Eastern Siberia, making it possible to cover anticipated power shortage in the Bodaibinsky District of the Irkutsk Region. Such a shortage is expected to occur due to the implementation of a large-scale project for the development of the railway infrastructure of the Eastern polygon.
Carrying out construction and installation work, reconstruction, technical re- equipment of facilities of organizations of the Transneft system at the facilities of Chernomorsktransneft LLC
The Sheskharis transshipment complex, which is part of the structure of Chernomortransneft JSC (a subsidiary of Transneft, PJSC) and located in Novorossiysk, is the end point of the main oil pipelines of Transneft, PJSC in the Krasnodar Krai, which ensure the transportation of oil from fields in Western Siberia and Azerbaijan and Kazakhstan.

For transhipment through the port of Novorossiysk, sulfurous oil of the Urals grade is accumulated at the Sheskharis and Grushovaya production sites; The main load is borne by the Grushovaya site — hydrocarbon raw materials are supplied to its reservoirs mainly through the system of main oil pipelines Tikhoretsk — Novorossiysk — 2, Tikhoretsk — Novorossiysk — 3 and Krymsk — Grushovaya. The Tikhoretsk -Novorossiysk — 4 main oil pipeline is also connected to the tank farm of the Grushovaya site with the construction of new mud filter sites with a drainage system and a unit with safety valves.

The construction of new and reconstruction of existing oil trunk pipelines is carried out as part of the implementation of the South Project, a long-term large-scale program of Transneft, PJSC. The goal of this strategic project is to increase the capacity of main oil pipelines supplying raw materials to oil refineries in the Krasnodar Krai, as well as the formation of a new powerful transport corridor for the supply of diesel fuel to the south of Russia and abroad.
Customer: JSC «Chernomortransneft»
Object type: Oil and gas construction
Length: 119.8 km
District: Southern Federal District
Year: 2023-2025
Construction of 500 kV Nizhneangarskaya — Ust-Kut overhead line No. 2
Carrying out construction, installation and commissioning, supply of materials and equipment for the construction of the section of the 500 kV overhead line from corner 18 to the corner 33a — 500 kV Nizhneangarskaya substation under the title Construction of the 500 kV Nizhneangarskaya — Ust-Kut No. 2 overhead line with an approximate length of 480 km, reconstruction of the 500 kV substation outdoor switchgear 500 kV Ust-Kut (extension for installation of a linear cell and a shunt reactor 500 kV with a power of 180 Mvar) (for TP of power receiving devices and electrical energy production facilities of JSC Russian Railways)" for the needs of the branch of PJSC FGC UES — MES of Siberia.

The new 500 kV overhead line "Nizhneangarskaya — Ust-Kut" is part of a large-scale project to further increase the throughput and carrying capacity of the Baikal-Amur Main Line and to ensure its uninterrupted power supply, as well as to strengthen intersystem connections Irkutsk — Buryatia.
Customer: PJSC FGC UES
Object type: Electric grid construction
Length: 222 km
District: Far eastern federal district
Year: 2022-2025
Construction of a network infrastructure for the external power supply of the Chayandinsky oil and gas condensate field
Customer: PJSC FGC UES
Object type: Electric grid construction
Length: 153 km
District: Far eastern federal district
Year: 2022-2023
Construction is being carried out in the most difficult weather and climatic conditions, in areas that are unfavorable in engineering and geological terms: in the permafrost zone, where frosts down to -60 °C are possible in winter. During the construction of the overhead line, steel lattice supports of a new unification were installed. At the Chayanda substation and the Nyuya switching point, relay protection and automated control system complexes developed in Russia were installed. Energy facilities are also equipped with highly reliable SF6 switching equipment. Work on the project is part of the construction of a network infrastructure for external power supply to the Chayandinskoye oil and gas condensate field, which is the resource base of the Power of Siberia gas pipeline. This main gas pipeline supplies Russian gas from Yakutia to the Primorsky krai, the People’s Republic of China and the countries of the Asia-Pacific region.

Construction is being carried out in the most difficult weather and climatic conditions, in areas that are unfavorable in engineering and geological terms: in the permafrost zone, where frosts down to -60 °C are possible in winter. During the construction of the overhead line, steel lattice supports of a new unification were installed. At the Chayanda substation and the Nyuya switching point, relay protection and automated control system complexes developed in Russia were installed. Energy facilities are also equipped with highly reliable SF6 switching equipment. Work on the project is part of the construction of a network infrastructure for external power supply to the Chayandinskoye oil and gas condensate field, which is the resource base of the Power of Siberia gas pipeline. This main gas pipeline supplies Russian gas from Yakutia to the Primorsky krai, the People’s Republic of China and the countries of the Asia-Pacific region.
Construction and installation works on a plot of VL 500 kV «Nizhneangarsk – Ust-Kut» № 1
Customer: PJSC FGC UES
Object type: Electric grid construction
Length: 220,6 km
District: Far eastern federal district
Year: 2021-2022
Carrying out construction and installation work on the section of 500 kV Nizhneangarskaya - Ust-Kut No. 1 overhead line from corner 18 to corner 33A under the title Construction of the 500 kV Nizhneangarskaya substation with transformer capacity of 1002 MVA and CVRM 730 MVAr (ShR-500 kV 3x180 MVAr, UShR-220 kV 2x35 MVAr, BSK-220 kV 2x60 MVAr), construction of a single-circuit overhead line 500 kV Nizhneangarskaya - Ust-Kut with approximate length of 465 km, reconstruction of 220 kV overhead line Kichera - Novy Uoyan and 220 kV overhead line Angoya - Novy Uoyan (for technological connection of power receiving devices of JSC «RUSSIAN RAILWAYS»)».
Construction of 220 kV overhead line «Tynda — Lopcha — Hani — Chara». III stage of construction. Construction of 220 kV overhead line «Hani—Chara» No. 2. Reconstruction of 220 kV substation «Chara» (in the volume providing connection of 220 kV overhead line «Hani — Chara» No. 2)
Customer: PJSC FGC UES
Object type: Electric grid construction
Length: 129,8 km
District: Far eastern federal district
Year: 2020-2022
Power transmission line 220 kV Tynda — Lopcha — Khani — Chara. Ill stage of construction. Construction of 220 kV overhead line Khani — Chara No. 2. Reconstruction of 220 kV Chara substation (to the extent that ensures the connection of 220 kV overhead line Khani — Chara No. 2).

220 kV overhead line "Tynda — Lopcha — Hani — Chara" is designed to provide power supply to the facilities of the Eastern Test Site (facilities of the Baikal-Amur Mainline — BAM), as well as to supply power to the Udokan mining and metallurgical plant. Udokan Copper LLC is developing the largest copper deposit in Russia and the third largest copper deposit in the world. The commissioning of this high-voltage line will ensure the reliability of the operation of the Interconnected Power System (IPS) of Siberia and the IPS of the East.
Construction of a single-circuit 220 kV overhead line «Tynda —Lopcha —Khani —Chara» with an approximate length of 560 km with extension of the 220 kV Tynda substation per 220 kV linear cell, 220 kV Lopcha substation per  two linear cells 220 kV, PS 220 kV «Khani» for two linear cells 220 kV, PS 220 kV «Chara» for one linear cell 220 kV. II construction stage
Customer: PJSC FGC UES
Object type: Electric grid construction
Length: 560 km
District: Far eastern federal district
Year: 2020-2022
As part of the implementation of stage 2, ESK Energomost LLC carried out work on the construction of 80 km of 220 kV Lopcha — Hani overhead line with the expansion of 220 kV Hani substation. As part of the expansion of the substation, construction, installation and commissioning work was carried out on 2 new linear cells at 220 kV Khani substation, as well as the construction of a cell for connecting a 220 kV shunt reactor. Work was carried out on relay protection and control systems, the communication system was modernized, and work was completed to modernize substation systems. 220 kV overhead line Lopcha — Khani with the expansion of 220 kV substation Khani is included in the macro-project of PJSC FSK-Rosseti for the development of the external power supply system of the Baikal-Amur and Trans-Siberian railways. Also, the developers of the Udokan copper deposit, whose resources are estimated at 26.7 million tons, will receive an additional 146 MW of power.
Oil pipeline — branch line «TS ESPO — Komsomolsk Refinery». Route road construction
The scope of construction and installation work on the oil pipeline branch to the Komsomolsk Oil Refinery (branch from the Eastern Siberia — Pacific Ocean pipeline system) included the construction of 39.3 km long route along the route, driveways to oil spill response sites (OSR) with a total length of 13.7 km, as well as the construction of four bridges across the Selgon, Kharpi, Khevcen and Alkan rivers. When constructing foundations for bridge crossing supports, the installation of bored and prismatic piles is provided. The work was complicated by the fact that construction was carried out in a swampy area, and therefore the area was subject to seasonal flooding.
Customer: Transneft Far East LLC
Object type: Oil and gas construction
Length: 53 km
District: Far eastern federal district
Year: 2019-2021
Construction of Onshore Technological Complex and Underwater Production Complex facilities as part of the construction project "Development of the Kirinskoye Gas Condensate Field" on a turnkey basis for the needs of Gazprom, PJSC
Construction of facilities of the Onshore Technological Complex and the Subsea Production Complex for the Kirinskoye gas condensate field, a promising oil and gas project on the coastal shelf of Sakhalin Island, which is part of the large-scale Sakhalin-3 project. The Kirinskoye gas condensate field will become one of the main sources of gas for the Sakhalin — Khabarovsk — Vladivostok gas transportation system. The field is located in the Sea of Okhotsk, 28 km from the coast; its proven recoverable reserves are estimated at 137 billion m3 of gas and 15.9 million tons of gas condensate. For the first time in the Russian Federation, gas and gas condensate production at the Kirinskoye gas condensate field will be carried out using a high-tech underwater production complex.
Customer: Gazprom / RusGazDobycha
Object type: Oil and gas construction
Length: Areal object
District: Far eastern federal district
Year: 2022-2032
Construction of the 220 kV overhead line «Peleduy —Sukhoi Log» (2nd circuit)
Customer: FGC UES, PJSC
Object type: Electric grid construction
Length: 262,25 km
District: Far eastern federal district
Year: 2018-2020
The construction of overhead lines was carried out in remote areas of the Republic of Sakha (Yakutia) and the Irkutsk Oblast — in the regions of the Far North and similar territories in the complete absence of transport infrastructure. The geological structure of the overhead line route was predominantly represented by permafrost soils, so the Project provided for the measures to preserve permafrost. Taking into account the construction conditions, the facility was built multiple times ahead of the standard deadlines for the construction of 220 kV voltage class facilities. The work was carried out in accordance with the approved schedule despite unfavorable weather and climatic conditions (extreme sub-zero temperatures, flooding of mountain rivers, in the regions of the constituent entities of the Russian Federation where construction took place, a state of emergency was introduced due to a large number of forest fires). The scope of construction of the overhead line also included the construction of a large crossing across the river Lena in the area of the Peleduy village with a length of 2.3 km with a separate scope of work on the construction of a transition support on Polovinny Island.

The commissioning of 220 kV Peleduy — Sukhoi Log overhead line from 220 kV Sukhoi Log substation made it possible to close the Peleduy energy ring, which also includes the 500 kV Ust-Kut substation and 220 kV substation Peleduy, Sukhoi Log, and Mamakan and "Taximo". Commissioning of the energy ring is a key measure to reduce the risk of disruption of power supply to consumers and eliminate power shortages in the Mamsko-Chuysky and Bodaibinsky energy districts of the Irkutsk energy system. These measures are of great importance for the development of the entire economy of Eastern Siberia, increasing the reliability of the energy supply of the Baikal-Amur Main Line, ensuring the development of new promising deposits of precious metals, including the largest gold ore deposit Sukhoi Log. The energization of the title facilities provided a solution to the strategic issue of synchronous operation of UES of the Russian Federation and the UES of the East within the framework of the unification of the two energy systems.