The overhead line was built in the Far North and similar areas of Russia with no transportation infrastructure at all. Putting the facility into operation made it possible to close the Peleduy Power Ring, which was a key measure to reduce the risks of power supply disruption to consumers and eliminate power shortages in the Mama-Chuya and Bodaibo Power Districts of the Irkutsk Power System.
220 kV «Peleduy - Sukhoy Log 2 circuit» HV line
Customer: PJSC FGC UES
Object type: electric grid construction
Location: Republic of Sakha (Yakutia)
Completion period: February 2018 - November 2020